Skip to content
Davis-Bacon

WV20260052 (Rev 1)

Coverage: West Virginia • Grant.

Published: May 18, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
MILLWRIGHT$39.60$26.06
ELECTRICIAN$42.20$20.39
POWER EQUIPMENT OPERATOR: GROUP 4 OILER$34.62$20.45
POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER$38.08$20.45
CUBIC YARD CAPACITY, BACKHOE, BULLDOZERS, BOBCAT/SKID STEER/SKID LOADER, FORKLIFT, DRILL, MECHANIC, EXCAVATORS AND SHOVELS WITH AN OPERATING WEIGHT OF UP TO ONE HUNDRED TEN THOUSAND (110,000) POUNDS$39.19$20.45
OPERATOR: GROUP 1 CRANES (ALL TYPES), BOOM TRUCKS, LOADERS OF SIX (6) CUBIC YARD CAPACITY AND OVER, EXCAVATORS AND SHOVELS WITH AN OPERATING WEIGHT OF ONE HUNDRED TEN THOUSAND (110,000) POUNDS AND OVER$41.95$20.45
POWER EQUIPMENT OPERATOR: PIPELINE: GROUP 2 OILER$39.19$20.45
POWER EQUIPMENT OPERATOR: PIPELINE: GROUP 1 BOOM, BULLDOZER, EXCAVATOR, MECHANIC, PIPE BENDING MACHINE$41.95$20.45
POWER EQUIPMENT OPERATOR: SINGLE AND DOUBLE AXLE DUMP TRUCKS$41.95$20.45
IRONWORKER: ORNAMENTAL$35.50$29.11
IRONWORKER: REINFORCING AND STRUCTURAL$34.84$25.40
LABORER: (PIPELINE) CHAIN SAW, COMMON, FLAGGER, LANDSCAPE, PIPELAYER, SANDBLASTER$25.26$16.50
LABORER: GROUP 3 CARPENTER TENDER, COMMON OR GENERAL, FLAGGER, LANDSCAPE$25.26$16.50
PERATING VIBRATOR PLATE AND FINISHING OF FOOTERS/FOUNDATIONS), HAND HELD DRILL, FORM WORK ONLY, GRADE CHECKER, GROUTING, PIPELAYER, SKYTRAK FORKLIFT OPERATOR, TAMPER (HAND HELD), WACKER ROLLER OPERATOR$26.32$16.50
LABORER: GROUP 1 TUNNEL DRILLER, TUNNEL MINER$27.35$16.50
CEMENT MASON/CONCRETE FINISHER$35.77$27.54
LABORER: MASON TENDER - CEMENT/CONCRETE$26.17$16.50

Related Wage Determinations

View directory →