Davis-Bacon
WV20260056 (Rev 1)
Coverage: West Virginia • Marion.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| ELECTRICIAN | $42.20 | $20.39 |
| POWER EQUIPMENT OPERATOR: GROUP 4 OILER | $34.62 | $20.45 |
| POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER | $38.08 | $20.45 |
| LOADERS UP TO SIX (6) CUBIC YARD CAPACITY, BULLDOZERS, BOBCAT/SKID STEER/SKID LOADER, FORKLIFT, DRILL, EXCAVATORS AND SHOVELS WITH AN OPERATING WEIGHT OF UP TO ONE HUNDRED TEN THOUSAND (110,000) POUNDS | $39.19 | $20.45 |
| OPERATOR: GROUP 1 CRANES (ALL TYPES), BOOM TRUCKS, LOADERS OF SIX (6) CUBIC YARD CAPACITY AND OVER, EXCAVATORS AND SHOVELS WITH AN OPERATING WEIGHT OF ONE HUNDRED TEN THOUSAND (110,000) POUNDS AND OVER | $41.95 | $20.45 |
| IRONWORKER, ORNAMENTAL, REINFORCING AND STRUCTURAL | $35.50 | $29.11 |
| LABORER: GROUP 2 FLAGGER | $25.26 | $16.80 |
| LABORER: GROUP 1 CHAIN SAW, CONCRETE WORKER, HAND HELD DRILL, FORM WORK, GRADE CHECKER, SIGNAL MAN | $28.02 | $16.80 |
| CEMENT MASON/CONCRETE FINISHER | $35.77 | $27.54 |
| TRUCK DRIVER: SINGLE AND DOUBLE AXLE DUMP TRUCKS | $23.44 | $12.52 |
| OPERATOR: BACKHOE | $24.39 | $15.50 |
| LABORER: PIPELAYER | $17.79 | $5.93 |
| LABORER: COMMON OR GENERAL | $22.59 | $10.14 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $26.17 | $16.50 |
| POWER EQUIPMENT OPERATOR: MECHANIC | $36.57 | $19.18 |
Related Wage Determinations
View directory →Davis-Bacon
WV20260110 (Rev 1)
West Virginia • Hampshire, Morgan
Davis-Bacon
WV20260013 (Rev 1)
West Virginia • Lewis
Davis-Bacon
WV20260025 (Rev 1)
West Virginia • Ritchie
Davis-Bacon
WV20260030 (Rev 1)
West Virginia • Upshur
Davis-Bacon
WV20260034 (Rev 1)
West Virginia • Berkeley
Davis-Bacon
WV20260035 (Rev 1)
West Virginia • Cabell