Skip to content
SAM WDOL Directory

Wage Determinations

Review SCA, DBA, and CBA wage determinations with location coverage, revisions, rates, and benefit references.

321 records • Page 11 of 14
DBA
245
SCA
52
CBA
24
Active
321
With Rates
296
With Benefits
52
How To Choose
DBA (Construction)
Use for construction, alteration, or repair labor tied to Davis-Bacon prevailing wage requirements.
SCA (Service Contracts)
Use for service contracts where labor categories map to service occupation codes and fringe benefit rules.
CBA (Union Terms)
Use when the solicitation references collective bargaining agreement terms for covered labor classes.
Published Jan 02, 2026
Minnesota • Cass
ELEVATOR CONSTRUCTORS
$62.52 + $45.36 fringe
POWER EQUIPMENT OPERATOR: (Commercial Group 1)
$51.03 + $26.90 fringe
HELICOPTER PILOT; TOWER CRANE 250 FEET AND OVER; TRUCK CRAWLER CRANE WITH 200 FEET OF BOOM AND OVER, INCLUDING JIB POWER EQUIPMENT OPERATOR: (Commercial Group 2)
$50.64 + $26.90 fringe
Published Jan 02, 2026
Minnesota • Clay
ELEVATOR CONSTRUCTORS
$59.95 + $44.53 fringe
Piledriver (INCLUDING VIBRATORY DRIVER OR EXTRACTOR FOR PILING AND SHEETING OPERATIONS)
$49.46 + $30.23 fringe
HELICOPTER PILOT; TOWER CRANE 250 FEET AND OVER; TRUCK CRAWLER CRANE WITH 200 FEET OF BOOM AND OVER, INCLUDING JIB POWER EQUIPMENT OPERATOR: (Commercial Group 2)
$48.53 + $26.40 fringe
Published Jan 02, 2026
Minnesota • Kittson
ELEVATOR CONSTRUCTORS
$59.95 + $44.53 fringe
GLAZIER
$48.98 + $26.75 fringe
FEET OF BOOM AND OVER; PILE DRIVING WHEN THREE DRUMS IN USE; TRUCK OR CRAWLER CRANE WITH 150 FEET OF BOOM UP TO AND NOT INCLUDING 200 FEET, INCLUDING JIB POWER EQUIPMENT OPERATOR: (Commercial Group 3)
$47.02 + $26.88 fringe
Published Jan 02, 2026
Minnesota • Houston
ELEVATOR CONSTRUCTORS
$57.49 + $43.71 fringe
HEATING AND FROST INSULATORS
$57.24 + $31.95 fringe
CEMENT MASON
$55.01 + $14.13 fringe
Published Jan 02, 2026
Minnesota • Douglas, Grant, Otter Tail
Sheet Metal Worker
$11.66 + $1.32 fringe
Bricklayer/Blocklayer
$8.65 + $0.00 fringe
Plumber, Pipefitter, Steamfitter
$8.00 + $0.00 fringe
Published Jan 02, 2026
Minnesota • Steele
ELEVATOR CONSTRUCTORS
$62.52 + $45.36 fringe
HEATING AND FROST INSULATORS
$57.24 + $31.95 fringe
CEMENT MASON
$55.01 + $14.13 fringe
Published Jan 02, 2026
Minnesota • Aitkin
ELEVATOR CONSTRUCTORS
$62.52 + $45.36 fringe
POWER EQUIPMENT OPERATOR: (Commercial Group 1)
$51.03 + $26.90 fringe
HELICOPTER PILOT; TOWER CRANE 250 FEET AND OVER; TRUCK CRAWLER CRANE WITH 200 FEET OF BOOM AND OVER, INCLUDING JIB POWER EQUIPMENT OPERATOR: (Commercial Group 2)
$50.64 + $26.90 fringe
Published Jan 02, 2026
Minnesota • Carlton
ELEVATOR CONSTRUCTORS
$62.52 + $45.36 fringe
POWER EQUIPMENT OPERATOR: (Commercial Group 1)
$51.03 + $26.90 fringe
HELICOPTER PILOT; TOWER CRANE 250 FEET AND OVER; TRUCK CRAWLER CRANE WITH 200 FEET OF BOOM AND OVER, INCLUDING JIB POWER EQUIPMENT OPERATOR: (Commercial Group 2)
$50.64 + $26.90 fringe
Published Jan 02, 2026
Minnesota • Lake of the Woods
ELEVATOR CONSTRUCTORS
$59.95 + $44.53 fringe
HEATING AND FROST INSULATORS
$50.51 + $23.45 fringe
GLAZIER
$48.98 + $26.75 fringe
Published Jan 02, 2026
Minnesota • St Louis
ELEVATOR CONSTRUCTORS
$62.52 + $45.36 fringe
POWER EQUIPMENT OPERATOR: (Commercial Group 1)
$51.03 + $26.90 fringe
HELICOPTER PILOT; TOWER CRANE 250 FEET AND OVER; TRUCK CRAWLER CRANE WITH 200 FEET OF BOOM AND OVER, INCLUDING JIB POWER EQUIPMENT OPERATOR: (Commercial Group 2)
$50.64 + $26.90 fringe
Published Jan 02, 2026
Minnesota • Kanabec, Mille Lacs, Pine
PLUMBER
$7.97 + $0.00 fringe
BRICKLAYER
$7.25 + $0.00 fringe
CEMENT MASON/CONCRETE FINISHER
$7.25 + $0.00 fringe
Published Jan 02, 2026
Minnesota • Becker, Mahnomen, Norman +2
Plumber, Pipefitter, Steamfitter
$11.14 + $1.79 fringe
Drywall Finisher/Taper
$10.04 + $0.00 fringe
ELECTRICIAN
$9.48 + $0.00 fringe
Published Jan 02, 2026
Minnesota • Mahnomen
ELEVATOR CONSTRUCTORS
$62.52 + $45.36 fringe
GLAZIER
$48.98 + $26.75 fringe
HELICOPTER PILOT; TOWER CRANE 250 FEET AND OVER; TRUCK CRAWLER CRANE WITH 200 FEET OF BOOM AND OVER, INCLUDING JIB POWER EQUIPMENT OPERATOR: (Commercial Group 2)
$48.53 + $26.40 fringe
Published Jan 02, 2026
Minnesota • Todd
ELEVATOR CONSTRUCTORS
$62.52 + $45.36 fringe
HEATING AND FROST INSULATORS
$57.24 + $31.95 fringe
PLUMBER
$54.79 + $30.58 fringe
Published Jan 02, 2026
Minnesota • Rice
ELEVATOR CONSTRUCTORS
$62.52 + $45.36 fringe
ELECTRICIAN
$58.31 + $36.48 fringe
SHEET METAL WORKER
$57.96 + $34.57 fringe
Published Jan 02, 2026
Minnesota • Dodge
ELEVATOR CONSTRUCTORS
$62.52 + $45.36 fringe
HEATING AND FROST INSULATORS
$57.24 + $31.95 fringe
MECHANIC; TRACTOR TRAILER DRIVER; TRUCK DRIVER (HAULING MACHINERY INCLUDING OPERATION OF HAND AND POWER OPERATED WINCHES) TRUCK DRIVER (Group 2)
$54.24 + $0.01 fringe
Published Jan 02, 2026
Minnesota • Swift
ELEVATOR CONSTRUCTORS
$62.52 + $45.36 fringe
HEATING AND FROST INSULATORS
$57.24 + $31.95 fringe
CEMENT MASON
$50.06 + $25.45 fringe
Published Jan 02, 2026
Minnesota • McLeod, Sibley
ELEVATOR MECHANIC
$62.52 + $38.43 fringe
PLUMBER
$59.54 + $33.26 fringe
hanical systems. Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems whether they contain asbestos or not)
$55.34 + $34.03 fringe
Not affiliated with the U.S. Government. Verify final wage determination applicability and full text on SAM.gov.