Skip to content
SAM WDOL Directory

Wage Determinations

Review SCA, DBA, and CBA wage determinations with location coverage, revisions, rates, and benefit references.

745 records • Page 12 of 32
DBA
370
SCA
82
CBA
293
Active
745
With Rates
451
With Benefits
82
How To Choose
DBA (Construction)
Use for construction, alteration, or repair labor tied to Davis-Bacon prevailing wage requirements.
SCA (Service Contracts)
Use for service contracts where labor categories map to service occupation codes and fringe benefit rules.
CBA (Union Terms)
Use when the solicitation references collective bargaining agreement terms for covered labor classes.
Published Jan 02, 2026
Virginia • Henrico
POWER EQUIPMENT OPERATOR (Crane)
$39.99 + $18.05 fringe
BOILERMAKER
$38.97 + $27.39 fringe
ELECTRICIAN
$36.85 + $17.18 fringe
Published Jan 02, 2026
Virginia • Prince Edward
OPERATOR: Crane
$26.68 + $0.00 fringe
OPERATOR: Grader/Blade, Includes Finishing
$26.13 + $0.00 fringe
PAVEMENT MARKING TRUCK DRIVER
$21.40 + $0.00 fringe
Published Jan 02, 2026
Virginia • Alleghany, Bath, Highland +6
ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL (Duct, Pipe & Mechanical System Insulation)
$40.77 + $20.17 fringe
POWER EQUIPMENT OPERATOR Bulldozer
$38.79 + $18.05 fringe
SHEET METAL WORKER, Includes HVAC Duct Installation
$22.33 + $7.94 fringe
Published Jan 02, 2026
Virginia • Dickenson
OPERATOR: Crane
$26.68 + $0.00 fringe
OPERATOR: Grader/Blade, Includes Finishing
$26.13 + $0.00 fringe
OPERATOR: Milling Machine
$21.13 + $0.00 fringe
Published Jan 02, 2026
Virginia • Amherst, Appomattox, Bedford +2
POWER EQUIPMENT OPERATOR Cranes 90 tons & over capacity; Tower & Climbing Cranes with Controls 100 ft. above ground
$40.99 + $18.05 fringe
Cranes under 90 tons
$39.99 + $18.05 fringe
IRONWORKER, STRUCTURAL
$21.55 + $1.39 fringe
Published Jan 02, 2026
Virginia • Nottoway
OPERATOR: Crane
$26.68 + $0.00 fringe
OPERATOR: Grader/Blade, Includes Finishing
$26.13 + $0.00 fringe
PAVEMENT MARKING TRUCK DRIVER
$21.40 + $0.00 fringe
Published Jan 02, 2026
Virginia • Dinwiddie
ELEVATOR MECHANIC
$51.39 + $38.43 fringe
POWER EQUIPMENT OPERATOR Cranes 90 tons & over capacity; Tower & Climbing Cranes with Controls 100 ft. above ground
$40.99 + $18.05 fringe
ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL (Duct, Pipe & Mechanical System Insulation)
$40.77 + $20.17 fringe
Published Jan 02, 2026
Virginia • Hampton*
ELEVATOR MECHANIC
$52.06 + $38.43 fringe
POWER EQUIPMENT OPERATOR Cranes 90 tons & over capacity; Tower & Climbing Cranes with Controls 100 ft. above ground
$40.99 + $18.05 fringe
Cranes under 90 tons
$39.99 + $18.05 fringe
Published Jan 02, 2026
Virginia • Brunswick, Charlotte, Emporia* +7
OPERATOR: Crane 90 tons and over
$40.99 + $18.05 fringe
Under 90 tons
$39.99 + $18.05 fringe
ELECTRICIAN
$18.21 + $3.11 fringe
Published Jan 02, 2026
Virginia • Cumberland
Excavator
$39.99 + $18.05 fringe
Power equipment operators: Bulldozer
$38.79 + $18.05 fringe
Mechanic
$26.78 + $6.32 fringe
Published Jan 02, 2026
Virginia • Buckingham, Fluvanna, Greene +1
ELEVATOR MECHANIC
$51.39 + $38.43 fringe
POWER EQUIPMENT OPERATOR Cranes 90 tons & over capacity; Tower & Climbing Cranes with Controls 100 ft. above ground
$40.99 + $18.05 fringe
ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL (Duct, Pipe & Mechanical System Insulation)
$40.77 + $20.17 fringe
Published Jan 02, 2026
Virginia • Botetourt, Craig, Franklin +3
POWER EQUIPMENT OPERATOR Cranes 90 tons & over capacity; Tower & Climbing Cranes with Controls 100 ft. above ground
$40.99 + $18.05 fringe
Cranes under 90 tons
$39.99 + $18.05 fringe
IRONWORKER, STRUCTURAL
$21.55 + $1.39 fringe
Published Jan 02, 2026
Virginia • Surry
ASBESTOS WORKER/HEAT & FROST INSULATOR Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems
$33.27 + $12.20 fringe
Mechanic
$26.78 + $6.32 fringe
Crane (Tower)
$23.29 + $6.02 fringe
Published Jan 02, 2026
Virginia • Dinwiddie, Petersburg*
POWER EQUIPMENT OPERATOR Cranes 90 tons & over capacity; Tower & Climbing Cranes with Controls 100 ft. above ground
$40.99 + $18.05 fringe
Cranes under 90 tons
$39.99 + $18.05 fringe
BRICKLAYER
$22.44 + $10.23 fringe
Published Jan 02, 2026
Virginia • Amherst
ELECTRICIAN, Includes Traffic Signalization
$36.85 + $17.18 fringe
IRONWORKER, STRUCTURAL
$27.38 + $0.00 fringe
OPERATOR: Grader/Blade
$26.13 + $0.00 fringe
Published Jan 02, 2026
Virginia • Craig
ELECTRICIAN, Includes Traffic Signalization
$36.85 + $17.18 fringe
IRONWORKER, STRUCTURAL
$27.38 + $0.00 fringe
OPERATOR: Grader/Blade
$26.13 + $0.00 fringe
Published Jan 02, 2026
Virginia • Alexandria*, Arlington
ELECTRICIAN, Includes Traffic Signalization
$36.85 + $17.18 fringe
IRONWORKER, REINFORCING
$34.18 + $0.00 fringe
IRONWORKER, STRUCTURAL
$34.18 + $0.00 fringe
Published Jan 02, 2026
Virginia • Danville*, Pittsylvania
OPERATOR: Crane
$26.68 + $0.00 fringe
OPERATOR: Grader/Blade, Includes Finishing
$26.13 + $0.00 fringe
PAVEMENT MARKING TRUCK DRIVER
$21.40 + $0.00 fringe
Published Jan 02, 2026
Virginia • Floyd, Giles, Montgomery
ELECTRICIAN
$41.90 + $23.84 fringe
POWER EQUIPMENT OPERATOR Cranes 90 tons & over capacity; Tower & Climbing Cranes with Controls 100 ft. above ground
$40.99 + $18.05 fringe
ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL (Duct, Pipe & Mechanical System Insulation)
$40.77 + $20.17 fringe
Not affiliated with the U.S. Government. Verify final wage determination applicability and full text on SAM.gov.