Skip to content
SAM WDOL Directory

Wage Determinations

Review SCA, DBA, and CBA wage determinations with location coverage, revisions, rates, and benefit references.

228 records • Page 2 of 10
DBA
148
SCA
59
CBA
21
Active
228
With Rates
205
With Benefits
59
How To Choose
DBA (Construction)
Use for construction, alteration, or repair labor tied to Davis-Bacon prevailing wage requirements.
SCA (Service Contracts)
Use for service contracts where labor categories map to service occupation codes and fringe benefit rules.
CBA (Union Terms)
Use when the solicitation references collective bargaining agreement terms for covered labor classes.
Published May 18, 2026
Oregon • Tillamook
LINE CONSTRUCTION: LINEMAN
$64.17 + $24.54 fringe
ELECTRICIAN
$63.50 + $29.73 fringe
POWER EQUIPMENT OPERATOR GROUP 1B LATTICE BOOM CRANE: OPERATOR, 300 TONS THROUGH 399 TONS WITH OVER 200 FEET BOOM; OPERATOR 400 TONS AND OVER
$60.98 + $16.90 fringe
Published May 18, 2026
Oregon • Coos
ND SIMILAR TYPE; LOADERS: LOADER OPERATOR, 120,000 LBS. AND ABOVE; HYDRAULIC HOES-EXCAVATOR: EXCAVATOR OVER 130,000 LBS; BLADE OPERATOR-ROBOTIC; RUBBER TIRED SCRAPER WITH TANDOM SCRAPERS, MULTI-ENGINE
$54.75 + $16.90 fringe
LBS. THROUGH 130,000 LBS.; LOADERS: LOADER OPERATOR 60,000 AND LESS THAN 120,000; RUBBER TIRED SCRAPER: WITH TANDOM SCRAPERS; SELF LOADING, PADDLE WHEEL, AUGER TYPE, FINISH AND/OR 2 OR MORE UNITS
$53.60 + $16.90 fringe
LOADERS OPERATOR, FRONT END AND OVERHEAD, 25,000 LBS AND LESS THAN 60,000 LBS; RUBBER-TIRED DOZERS; ASPHALT PAVER; SCREED OPERATOR; BLADE OPERATOR; RUBBER-TIRED SCRAPER, SINGLE ENGINE, SINGLE SCRAPER
$50.27 + $16.90 fringe
Published May 18, 2026
Oregon • Coos
LINE CONSTRUCTION: LINEMAN
$64.17 + $24.54 fringe
POWER EQUIPMENT OPERATOR GROUP 1B LATTICE BOOM CRANE: OPERATOR, 300 TONS THROUGH 399 TONS WITH OVER 200 FEET BOOM; OPERATOR 400 TONS AND OVER
$60.98 + $16.90 fringe
MILLWRIGHT
$59.35 + $22.38 fringe
Published May 18, 2026
Oregon • Lincoln
LINE CONSTRUCTION: LINEMAN
$64.17 + $24.54 fringe
POWER EQUIPMENT OPERATOR GROUP 1B LATTICE BOOM CRANE: OPERATOR, 300 TONS THROUGH 399 TONS WITH OVER 200 FEET BOOM; OPERATOR 400 TONS AND OVER
$60.98 + $16.90 fringe
MILLWRIGHT
$59.35 + $22.38 fringe
Published May 18, 2026
Oregon • Benton
POWER EQUIPMENT OPERATOR GROUP 1B LATTICE BOOM CRANE: OPERATOR, 300 TONS THROUGH 399 TONS WITH OVER 200 FEET BOOM; OPERATOR 400 TONS AND OVER
$60.98 + $16.90 fringe
TON AND OVER; LATTICE BOOM CRANE: OPERATOR 200 TONS THROUGH 299 TONS, AND/OR OVER 200 FEET BOOM; HYDRAULIC CRANE: HYDRAULIC CRANE OPERATOR 90 TONS THROUGH 199 TONS WITH LUFFING OR TOWER ATTACHMENTS;
$56.66 + $16.90 fringe
ELECTRICIAN
$56.46 + $23.05 fringe
Published May 18, 2026
Oregon • Marion
CEIVE ZONE II PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 50 MILES FROM THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE III PAY FOR ALL CLASSIFICATIONS
$60.98 + $16.90 fringe
CEIVE ZONE II PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 50 MILES FROM THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE III PAY FOR ALL CLASSIFICATIONS
$58.82 + $16.90 fringe
CEIVE ZONE II PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 50 MILES FROM THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE III PAY FOR ALL CLASSIFICATIONS
$56.66 + $16.90 fringe
Published May 18, 2026
Oregon • Crook
HEAT & FROST INSULATOR
$62.02 + $22.36 fringe
PLUMBER
$60.77 + $34.72 fringe
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE
$54.75 + $16.90 fringe
Published May 18, 2026
Oregon • Baker, Benton, Clackamas +33
ALL JOBS OR PROJECTS SHALL BE COMPUTED FROM THE CITY HALL BY THE SHORTEST ROUTE TO THE GEOGRAPHICAL CENTER OF THE PROJECT
$62.47 + $16.70 fringe
ALL JOBS OR PROJECTS SHALL BE COMPUTED FROM THE CITY HALL BY THE SHORTEST ROUTE TO THE GEOGRAPHICAL CENTER OF THE PROJECT
$59.47 + $16.70 fringe
ALL JOBS OR PROJECTS SHALL BE COMPUTED FROM THE CITY HALL BY THE SHORTEST ROUTE TO THE GEOGRAPHICAL CENTER OF THE PROJECT
$59.31 + $16.70 fringe
Published May 18, 2026
Oregon • Coos
HEAT & FROST INSULATOR
$62.02 + $22.36 fringe
PLUMBER
$60.77 + $34.72 fringe
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE
$54.75 + $16.90 fringe
Published May 18, 2026
Oregon • Washington
CEIVE ZONE II PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 50 MILES FROM THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE III PAY FOR ALL CLASSIFICATIONS
$60.98 + $16.90 fringe
CEIVE ZONE II PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 50 MILES FROM THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE III PAY FOR ALL CLASSIFICATIONS
$58.82 + $16.90 fringe
CEIVE ZONE II PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 50 MILES FROM THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE III PAY FOR ALL CLASSIFICATIONS
$56.66 + $16.90 fringe
Published May 18, 2026
Oregon • Curry, Linn, Tillamook
ND SIMILAR TYPE; LOADERS: LOADER OPERATOR, 120,000 LBS. AND ABOVE; HYDRAULIC HOES-EXCAVATOR: EXCAVATOR OVER 130,000 LBS; BLADE OPERATOR-ROBOTIC; RUBBER TIRED SCRAPER WITH TANDOM SCRAPERS, MULTI-ENGINE
$54.75 + $16.90 fringe
LBS. THROUGH 130,000 LBS.; LOADERS: LOADER OPERATOR 60,000 AND LESS THAN 120,000; RUBBER TIRED SCRAPER: WITH TANDOM SCRAPERS; SELF LOADING, PADDLE WHEEL, AUGER TYPE, FINISH AND/OR 2 OR MORE UNITS
$53.60 + $16.90 fringe
LOADERS OPERATOR, FRONT END AND OVERHEAD, 25,000 LBS AND LESS THAN 60,000 LBS; RUBBER-TIRED DOZERS; ASPHALT PAVER; SCREED OPERATOR; BLADE OPERATOR; RUBBER-TIRED SCRAPER, SINGLE ENGINE, SINGLE SCRAPER
$50.27 + $16.90 fringe
Published May 18, 2026
Oregon • Hood River
HEAT & FROST INSULATOR
$62.02 + $22.36 fringe
PLUMBER
$60.77 + $34.72 fringe
SHEET METAL WORKER
$54.99 + $33.92 fringe
Published May 18, 2026
Oregon • Morrow
PLUMBERS AND PIPEFITTERS
$65.20 + $34.91 fringe
POWER EQUIPMENT OPERATOR GROUP 1B LATTICE BOOM CRANE: OPERATOR, 300 TONS THROUGH 399 TONS WITH OVER 200 FEET BOOM; OPERATOR 400 TONS AND OVER
$60.98 + $16.90 fringe
ELECTRICIAN
$60.00 + $27.78 fringe
Published May 18, 2026
Oregon • Union
PLUMBERS AND PIPEFITTERS
$65.20 + $34.91 fringe
POWER EQUIPMENT OPERATOR GROUP 1B LATTICE BOOM CRANE: OPERATOR, 300 TONS THROUGH 399 TONS WITH OVER 200 FEET BOOM; OPERATOR 400 TONS AND OVER
$60.98 + $16.90 fringe
ELECTRICIAN
$60.00 + $27.78 fringe
Published May 18, 2026
Oregon • Clackamas
CEIVE ZONE II PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 50 MILES FROM THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE III PAY FOR ALL CLASSIFICATIONS
$60.98 + $16.90 fringe
CEIVE ZONE II PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 50 MILES FROM THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE III PAY FOR ALL CLASSIFICATIONS
$58.82 + $16.90 fringe
CEIVE ZONE II PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 50 MILES FROM THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE III PAY FOR ALL CLASSIFICATIONS
$56.66 + $16.90 fringe
Published May 18, 2026
Oregon • Columbia
CEIVE ZONE II PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 50 MILES FROM THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE III PAY FOR ALL CLASSIFICATIONS
$60.98 + $16.90 fringe
CEIVE ZONE II PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 50 MILES FROM THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE III PAY FOR ALL CLASSIFICATIONS
$58.82 + $16.90 fringe
CEIVE ZONE II PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 50 MILES FROM THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE III PAY FOR ALL CLASSIFICATIONS
$56.66 + $16.90 fringe
Published May 18, 2026
Oregon • Umatilla
HEAT & FROST INSULATOR
$62.02 + $22.36 fringe
PLUMBER
$60.77 + $34.72 fringe
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY)
$54.99 + $33.92 fringe
Published May 18, 2026
Oregon • Morrow
HEAT & FROST INSULATOR
$62.02 + $22.36 fringe
PLUMBER
$60.77 + $34.72 fringe
ELECTRICIAN, EXCLUDES LOW VOLTAGE WIRING
$56.46 + $23.05 fringe
Published May 18, 2026
Oregon • Polk
CEIVE ZONE II PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 50 MILES FROM THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE III PAY FOR ALL CLASSIFICATIONS
$60.98 + $16.90 fringe
CEIVE ZONE II PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 50 MILES FROM THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE III PAY FOR ALL CLASSIFICATIONS
$58.82 + $16.90 fringe
CEIVE ZONE II PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 50 MILES FROM THE RESPECTIVE CITY HALL OF THE ABOVE MENTIONED CITIES SHALL RECEIVE ZONE III PAY FOR ALL CLASSIFICATIONS
$56.66 + $16.90 fringe
Not affiliated with the U.S. Government. Verify final wage determination applicability and full text on SAM.gov.