Davis-Bacon
AR20260140 (Rev 1)Published May 18, 2026
Arkansas • Hot Spring
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)
$22.11 + $0.00 fringe
OPERATOR: BOBCAT/SKID STEER/SKID LOADER
$21.60 + $0.00 fringe
OPERATOR: CRANE
$21.13 + $0.00 fringe
Review SCA, DBA, and CBA wage determinations with location coverage, revisions, rates, and benefit references.