Skip to content
SAM WDOL Directory

Wage Determinations

Review SCA, DBA, and CBA wage determinations with location coverage, revisions, rates, and benefit references.

228 records • Page 6 of 10
DBA
148
SCA
59
CBA
21
Active
228
With Rates
205
With Benefits
59
How To Choose
DBA (Construction)
Use for construction, alteration, or repair labor tied to Davis-Bacon prevailing wage requirements.
SCA (Service Contracts)
Use for service contracts where labor categories map to service occupation codes and fringe benefit rules.
CBA (Union Terms)
Use when the solicitation references collective bargaining agreement terms for covered labor classes.
Published Jan 02, 2026
Oregon • Benton, Lane
GROUP 1B
$60.98 + $16.90 fringe
GROUP 1A
$58.82 + $16.90 fringe
POWER EQUIPMENT OPERATOR GROUP 1
$56.66 + $16.90 fringe
Published Jan 02, 2026
Oregon • Crook
HEAT & FROST INSULATOR
$62.02 + $22.36 fringe
PLUMBER
$60.77 + $34.72 fringe
SHEET METAL WORKER, Includes HVAC Duct Installation
$54.99 + $33.92 fringe
Published Jan 02, 2026
Oregon • Yamhill
GROUP 1B
$60.98 + $16.90 fringe
GROUP 1A
$58.82 + $16.90 fringe
POWER EQUIPMENT OPERATOR GROUP 1
$56.66 + $16.90 fringe
Published Jan 02, 2026
Oregon • Multnomah
GROUP 1B
$60.98 + $16.90 fringe
GROUP 1A
$58.82 + $16.90 fringe
POWER EQUIPMENT OPERATOR GROUP 1
$56.66 + $16.90 fringe
Published Jan 02, 2026
Oregon • Deschutes
GROUP 1B
$60.98 + $16.90 fringe
GROUP 1A
$58.82 + $16.90 fringe
POWER EQUIPMENT OPERATOR GROUP 1
$56.66 + $16.90 fringe
Published Jan 02, 2026
Oregon • Umatilla
HEAT & FROST INSULATOR
$62.02 + $22.36 fringe
PLUMBER
$60.77 + $34.72 fringe
SHEET METAL WORKER (HVAC Duct Installation Only)
$54.99 + $33.92 fringe
Published Jan 02, 2026
Oregon • Clackamas
GROUP 1B
$60.98 + $16.90 fringe
GROUP 1A
$58.82 + $16.90 fringe
POWER EQUIPMENT OPERATOR GROUP 1
$56.66 + $16.90 fringe
Published Jan 02, 2026
Oregon • Benton
GROUP 1B
$60.98 + $16.90 fringe
GROUP 1A
$58.82 + $16.90 fringe
POWER EQUIPMENT OPERATOR GROUP 1
$56.66 + $16.90 fringe
Published Jan 02, 2026
Oregon • Grant
Plumbers and Pipefitters
$65.20 + $34.91 fringe
GROUP 1B
$60.98 + $16.90 fringe
Plumbers and Pipefitters
$60.77 + $34.72 fringe
Published Jan 02, 2026
Oregon • Morrow
HEAT & FROST INSULATOR
$62.02 + $22.36 fringe
PLUMBER
$60.77 + $34.72 fringe
ELECTRICIAN, Excludes Low Voltage Wiring
$56.46 + $23.05 fringe
Not affiliated with the U.S. Government. Verify final wage determination applicability and full text on SAM.gov.