Skip to content
University of Arkansas - Pulaski Technical College

RFP-25-012 Electrical Questions and Response

Solicitation: Not available
Notice ID: 1d377ec48d4c930467bd11011e8aabda
Contract snapshot

Federal opportunity from University of Arkansas - Pulaski Technical College. Place of performance: AR.

Source
Open on official portal →
Solicitation
1d377ec48d4c930467bd11011e8aabda
Performance
North Little Rock, AR
Response
No due date posted
Open on official portal →
Map for AR
Live POP
Place of performance
North Little Rock, AR
State: AR
Contracting office
Not listed

Point of Contact

Not available

Agency & Office

Department
University of Arkansas - Pulaski Technical College
Agency
Not available
Subagency
Not available
Office
Procurement
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
AR20260157 (Rev 1)
Published May 18, 2026Arkansas • Clay, Fulton, Independence +6
37 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 35 more rate previews.
Davis-BaconBest fitstate match
AR20260157 (Rev 1)
Open WD
Published May 18, 2026Arkansas • Clay, Fulton, Independence +6
Rate
TRUCK DRIVER: SEMI/TRAILER TRUCK
Base $10.75Fringe $0.00
Rate
TRUCK DRIVER: WATER TRUCK
Base $16.09Fringe $0.00
Rate
TRUCK DRIVER: LOWBOY TRUCK
Base $17.74Fringe $0.00
+34 more occupation rates in this WD
Davis-Baconstate match
AR20260152 (Rev 1)
Open WD
Published May 18, 2026Arkansas • White
Rate
TRUCK DRIVER: SEMI/TRAILER TRUCK
Base $10.75Fringe $0.00
Rate
TRUCK DRIVER: WATER TRUCK
Base $16.09Fringe $0.00
Rate
TRUCK DRIVER: LOWBOY TRUCK
Base $17.74Fringe $0.00
+34 more occupation rates in this WD
Davis-Baconstate match
AR20260164 (Rev 1)
Open WD
Published May 18, 2026Arkansas • Garland
Rate
TRUCK DRIVER: SEMI/TRAILER TRUCK
Base $12.50Fringe $0.00
Rate
TRUCK DRIVER: WATER TRUCK
Base $14.73Fringe $0.00
Rate
TRUCK DRIVER: LOWBOY TRUCK
Base $17.49Fringe $0.00
+33 more occupation rates in this WD
Davis-Baconstate match
AR20260148 (Rev 1)
Open WD
Published May 18, 2026Arkansas • St Francis
Rate
TRUCK DRIVER: SEMI/TRAILER TRUCK
Base $10.75Fringe $0.00
Rate
TRUCK DRIVER: WATER TRUCK
Base $16.09Fringe $0.00
Rate
TRUCK DRIVER: LOWBOY TRUCK
Base $18.75Fringe $0.00
+34 more occupation rates in this WD

Description

RFP-25-012 Electrical Questions and Response

Advisory bid range

Pricing and bid posture

medium confidence
$432,739 - $512,876

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$432,739
Target
$457,925
Premium
$512,876
Labor
$132,040
Direct
$157,000
Burden
$104,117
Fee + reserve
$53,969
Target $457,925Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,516,281,615
Sector total $3,516,281,615 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,459$3,347,126
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,516,281,615)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.