Skip to content
SAM WDOL Directory

Wage Determinations

Review SCA, DBA, and CBA wage determinations with location coverage, revisions, rates, and benefit references.

422 records • Page 1 of 18
DBA
344
SCA
54
CBA
24
Active
422
With Rates
397
With Benefits
54
How To Choose
DBA (Construction)
Use for construction, alteration, or repair labor tied to Davis-Bacon prevailing wage requirements.
SCA (Service Contracts)
Use for service contracts where labor categories map to service occupation codes and fringe benefit rules.
CBA (Union Terms)
Use when the solicitation references collective bargaining agreement terms for covered labor classes.
Published May 18, 2026
Arkansas • Monroe
OPERATOR: CRANE
$24.38 + $0.00 fringe
OPERATOR: MILLING MACHINE
$20.95 + $0.00 fringe
IRONWORKER, STRUCTURAL
$20.95 + $9.26 fringe
Published May 18, 2026
Arkansas • Yell
OPERATOR: CRANE
$25.60 + $0.00 fringe
OPERATOR: GRADER/BLADE
$22.68 + $0.00 fringe
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE
$20.77 + $0.00 fringe
Published May 18, 2026
Arkansas • Cleburne, Izard, Lawrence +6
POWER EQUIPMENT OPERATOR: CRANE
$34.25 + $15.00 fringe
POWER EQUIPMENT OPERATOR: FORKLIFT
$33.25 + $15.00 fringe
IRONWORKER, STRUCTURAL
$28.00 + $21.21 fringe
Published May 18, 2026
Arkansas • Lonoke
OPERATOR: MECHANIC
$22.19 + $0.00 fringe
HIGHWAY/PARKING LOT STRIPING: PAINTER
$21.75 + $0.00 fringe
TRUCK DRIVER: FLATBED TRUCK
$21.03 + $0.00 fringe
Published May 18, 2026
Arkansas • Grant, Perry
PLUMBER (INCLUDES HVAC PIPE INSTALLATION)
$34.41 + $15.70 fringe
PIPEFITTER (EXCLUDES HVAC PIPE INSTALLATION)
$34.41 + $15.70 fringe
BOILERMAKER
$34.21 + $23.92 fringe
Published May 18, 2026
Arkansas • Little River, Miller
OPERATOR: CRANE
$22.84 + $0.00 fringe
HIGHWAY/PARKING LOT STRIPING: PAINTER
$21.75 + $0.00 fringe
TRUCK DRIVER: FLATBED TRUCK
$21.03 + $0.00 fringe
Published May 18, 2026
Arkansas • Hot Spring
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)
$22.11 + $0.00 fringe
OPERATOR: BOBCAT/SKID STEER/SKID LOADER
$21.60 + $0.00 fringe
OPERATOR: CRANE
$21.13 + $0.00 fringe
Published May 18, 2026
Arkansas • Cleveland, Jefferson, Lincoln
PIPEFITTER
$34.41 + $15.70 fringe
BOILERMAKER
$34.21 + $23.92 fringe
MILLWRIGHT
$34.02 + $11.88 fringe
Published May 18, 2026
Arkansas • Garland
HIGHWAY/PARKING LOT STRIPING: PAINTER
$21.75 + $0.00 fringe
OPERATOR: CRANE
$21.13 + $0.00 fringe
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)
$21.04 + $0.00 fringe
Published May 18, 2026
Arkansas • Baxter
OPERATOR: CRANE
$24.84 + $0.00 fringe
OPERATOR: GRADER/BLADE
$22.68 + $0.00 fringe
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE
$20.77 + $0.00 fringe
Published May 18, 2026
Arkansas • Montgomery
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)
$24.70 + $0.00 fringe
OPERATOR: BOBCAT/SKID STEER/SKID LOADER
$21.60 + $0.00 fringe
OPERATOR: MILLING MACHINE
$20.95 + $0.00 fringe
Published May 18, 2026
Arkansas • St Francis
OPERATOR: CRANE
$25.21 + $0.00 fringe
OPERATOR: MECHANIC
$22.42 + $0.00 fringe
OPERATOR: MILLING MACHINE
$20.95 + $0.00 fringe
Published May 18, 2026
Arkansas • Clay, Fulton, Independence +6
OPERATOR: CRANE
$25.21 + $0.00 fringe
OPERATOR: MECHANIC
$22.42 + $0.00 fringe
OPERATOR: MILLING MACHINE
$20.95 + $0.00 fringe
Published May 18, 2026
Arkansas • Conway
OPERATOR: CRANE
$25.60 + $0.00 fringe
OPERATOR: MECHANIC
$22.83 + $0.00 fringe
OPERATOR: GRADER/BLADE
$22.68 + $0.00 fringe
Published May 18, 2026
Arkansas • Cleburne
OPERATOR: BULLDOZER
$20.60 + $0.00 fringe
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE
$17.54 + $2.27 fringe
CARPENTER, INCLUDES FORM WORK
$17.32 + $3.15 fringe
Published May 18, 2026
Arkansas • Union
POWER EQUIPMENT OPERATOR: CRANE
$34.25 + $15.00 fringe
MILLWRIGHT
$34.02 + $11.88 fringe
POWER EQUIPMENT OPERATOR: FORKLIFT
$33.25 + $15.00 fringe
Published May 18, 2026
Arkansas • Yell
POWER EQUIPMENT OPERATOR: CRANE
$34.25 + $15.00 fringe
MILLWRIGHT
$34.02 + $11.88 fringe
POWER EQUIPMENT OPERATOR: FORKLIFT
$33.25 + $15.00 fringe
Published May 18, 2026
Arkansas • Arkansas, Ashley, Bradley +4
PLUMBER
$34.41 + $15.70 fringe
POWER EQUIPMENT OPERATOR: CRANE
$34.25 + $15.00 fringe
POWER EQUIPMENT OPERATOR: FORKLIFT
$33.25 + $15.00 fringe
Published May 18, 2026
Arkansas • Benton
OPERATOR: CRANE
$24.21 + $6.79 fringe
ELECTRICIAN
$22.88 + $7.19 fringe
PAINTER (BRUSH AND ROLLER)
$18.00 + $0.00 fringe
Published May 18, 2026
Arkansas • Pulaski
OPERATOR: CRANE
$24.21 + $6.79 fringe
ELECTRICIAN
$23.22 + $9.75 fringe
CEMENT MASON/CONCRETE FINISHER
$18.34 + $3.41 fringe
Published May 18, 2026
Arkansas • Saline
PLUMBER (INCLUDES HVAC PIPE INSTALLATION)
$34.41 + $15.70 fringe
PIPEFITTER (EXCLUDES HVAC PIPE INSTALLATION)
$34.41 + $15.70 fringe
BOILERMAKER
$34.21 + $23.92 fringe
Not affiliated with the U.S. Government. Verify final wage determination applicability and full text on SAM.gov.