Facilities Management Spare Transformer
Federal opportunity from University of Arkansas Fayetteville (UAF) IFB Document Standard Terms & Conditions (Signature Sheets) Notice of Bid Opening Event Addendum #1 - 01/22/26 • University of Arkansas. Place of performance: AR. Response deadline: Jan 30, 2026.
- Source
- Open on official portal →
- Solicitation
- IFB01152026
- Performance
- AR
- Response
- Jan 30, 2026, 11:59 PM UTC
Point of Contact
Agency & Office
Applicable wage determinations
Best public WD match for the notice location and scope.
View more WD detail3 more WD matches and 4 more rate previews.↓
Description
IFB01152026 - Facilities Management Spare Transformer Issuing Campus - University of Arkansas Fayetteville (UAF) RFP Document Standard Terms & Conditions (Signature Sheets) Notice of Bid Opening Event Addendum #1 - 01/22/26 Issuing campus: University of Arkansas Fayetteville (UAF) RFP Document Standard Terms & Conditions (Signature Sheets) Notice of Bid Opening Event Addendum #1 - 01/22/26
Pricing and bid posture
Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.
This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The University of Arkansas Fayetteville (UAF) is issuing an Invitation for Bid (IFB01152026) for purchasing a spare transformer as part of its Facilities Management. Interested bidders should note the response deadline is set for January 30, 2026, and an addendum was released on January 22, 2026, detailing standard terms and conditions. This IFB presents a clear opportunity for suppliers in the transformer industry to engage with a major educational institution's infrastructure needs.
The University of Arkansas seeks to procure a spare transformer to support its Facilities Management operations, ensuring reliability and efficiency in their electrical systems.
- Manufacturers of transformers.
- Providers specializing in electrical systems components.
- Suppliers experienced with governmental educational institutions.
- Review the IFB documents and addendum thoroughly.
- Assess manufacturing capabilities to meet specifications.
- Develop competitive pricing strategies for the transformer.
- Ensure compliance with UAF's standard terms and conditions.
- Prepare and submit bid documents by the response deadline.
- Completed bid forms as per the IFB.
- Pricing details and manufacturer specifications.
- Confirmation of compliance with standard terms and conditions.
- Evidence of experience with similar projects.
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Review the UAF RFP Document Standard Terms & Conditions carefully.
- Ensure all documents are signed and submitted as required in the bid package.
- Consider competitive pricing aligned with industry standards.
- Include any potential volume discounts if applicable.
- Consider partnering with local suppliers for logistics and support.
- Potential for teaming with engineers for demonstrating transformer suitability.
- Ensure timely submission of all required documents to avoid disqualification.
- Potential technical specifications in the IFB that may require clarification.
- What are the specific transformer specifications needed?
- Are there any preferred manufacturers or models?
- Is there an opportunity for volume purchases beyond this bid?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Specific transformer specifications and requirements.
- Details on the current transformer infrastructure at UAF.
- Information about previous suppliers or contracts.
- Technical requirements not mentioned in the provided documents.
- Potential penalties or consequences for late submissions.
- Exact evaluation criteria for bids.
- Information regarding site visits or pre-bid meetings.
Service match
Optional support routes matched to this notice after the core solicitation details.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.