Skip to content
SAM WDOL Directory

Wage Determinations

Review SCA, DBA, and CBA wage determinations with location coverage, revisions, rates, and benefit references.

415 records • Page 2 of 18
DBA
194
SCA
108
CBA
113
Active
415
With Rates
301
With Benefits
108
How To Choose
DBA (Construction)
Use for construction, alteration, or repair labor tied to Davis-Bacon prevailing wage requirements.
SCA (Service Contracts)
Use for service contracts where labor categories map to service occupation codes and fringe benefit rules.
CBA (Union Terms)
Use when the solicitation references collective bargaining agreement terms for covered labor classes.
Published May 18, 2026
North Carolina • Edgecombe, Nash, Pitt
BRICKLAYER
$18.62 + $0.00 fringe
OPERATOR: BOBCAT/SKID STEER/SKID LOADER
$18.50 + $1.56 fringe
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE
$18.50 + $1.47 fringe
Published May 18, 2026
North Carolina • Cabarrus, Gaston
BRICKLAYER
$18.62 + $0.00 fringe
OPERATOR: BOBCAT/SKID STEER/SKID LOADER
$18.50 + $1.56 fringe
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE
$18.50 + $0.00 fringe
Published May 18, 2026
North Carolina • Gaston
PIPEFITTER
$33.96 + $13.48 fringe
ELECTRICIAN
$32.31 + $13.66 fringe
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY)
$30.74 + $16.51 fringe
Published May 18, 2026
North Carolina • Hoke
BRICKLAYER
$18.62 + $0.00 fringe
OPERATOR: BOBCAT/SKID STEER/SKID LOADER
$18.50 + $1.56 fringe
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE
$18.50 + $1.47 fringe
Published May 18, 2026
North Carolina • Buncombe, Haywood, Henderson +1
ELECTRICIAN
$18.88 + $2.16 fringe
BRICKLAYER
$18.62 + $0.00 fringe
OPERATOR: BOBCAT/SKID STEER/SKID LOADER
$18.50 + $1.56 fringe
Published May 18, 2026
North Carolina • Cumberland
BRICKLAYER
$18.62 + $0.00 fringe
OPERATOR: BOBCAT/SKID STEER/SKID LOADER
$18.50 + $1.56 fringe
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE
$18.50 + $1.47 fringe
Published May 18, 2026
North Carolina • Craven, Jones, Pamlico
BRICKLAYER
$18.62 + $0.00 fringe
OPERATOR: BOBCAT/SKID STEER/SKID LOADER
$18.50 + $1.56 fringe
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE
$18.50 + $1.47 fringe
Published May 18, 2026
North Carolina • Caswell, Granville, Halifax +2
PIPEFITTER (EXCLUDING HVAC SYSTEM INSTALLATION)
$31.66 + $12.69 fringe
OPERATOR: CRANE
$19.25 + $2.37 fringe
IRONWORKER, STRUCTURAL
$18.75 + $5.62 fringe
Published May 18, 2026
North Carolina • Jackson
PIPEFITTER (EXCLUDING HVAC SYSTEM INSTALLATION)
$31.66 + $12.69 fringe
OPERATOR: CRANE
$19.25 + $2.37 fringe
IRONWORKER, STRUCTURAL
$18.75 + $5.62 fringe
Published May 18, 2026
North Carolina • Pasquotank
PIPEFITTER (EXCLUDING HVAC SYSTEM INSTALLATION)
$31.66 + $12.69 fringe
BRICKLAYER
$19.38 + $8.73 fringe
OPERATOR: CRANE
$19.25 + $2.37 fringe
Published May 18, 2026
North Carolina • Perquimans
PIPEFITTER (EXCLUDING HVAC SYSTEM INSTALLATION)
$31.66 + $12.69 fringe
BRICKLAYER
$19.38 + $8.73 fringe
OPERATOR: CRANE
$19.25 + $2.37 fringe
Published May 18, 2026
North Carolina • Ashe, Clay, Graham +10
PIPEFITTER (EXCLUDING HVAC SYSTEM INSTALLATION)
$31.66 + $12.69 fringe
OPERATOR: CRANE
$19.25 + $2.37 fringe
IRONWORKER, STRUCTURAL
$18.75 + $5.62 fringe
Published May 18, 2026
North Carolina • Duplin, Lee, Lenoir +2
PIPEFITTER (EXCLUDING HVAC SYSTEM INSTALLATION)
$31.66 + $12.69 fringe
OPERATOR: CRANE
$19.25 + $2.37 fringe
BRICKLAYER
$19.09 + $8.73 fringe
Published May 18, 2026
North Carolina • Craven, Jones, Pamlico
PIPEFITTER
$33.96 + $13.48 fringe
IRONWORKER
$29.75 + $18.00 fringe
PLUMBER
$23.11 + $0.00 fringe
Published May 18, 2026
North Carolina • Bladen, Cleveland, Columbus +16
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE
$16.18 + $0.00 fringe
CARPENTER (FORM WORK ONLY)
$15.47 + $1.50 fringe
CEMENT MASON/CONCRETE FINISHER
$13.10 + $1.32 fringe
Published May 18, 2026
North Carolina • Union
BRICKLAYER
$18.62 + $0.00 fringe
OPERATOR: BOBCAT/SKID STEER/SKID LOADER
$18.50 + $1.56 fringe
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE
$18.50 + $0.00 fringe
Published May 18, 2026
North Carolina • Wayne
BRICKLAYER
$18.62 + $0.00 fringe
OPERATOR: BOBCAT/SKID STEER/SKID LOADER
$18.50 + $1.56 fringe
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE
$18.50 + $1.47 fringe
Published May 18, 2026
North Carolina • Mecklenburg
PIPEFITTER
$33.96 + $13.48 fringe
ELECTRICIAN
$32.31 + $13.66 fringe
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY)
$30.74 + $16.51 fringe
Published May 18, 2026
North Carolina • Cabarrus, Lincoln, Rowan +1
PIPEFITTER
$33.96 + $13.48 fringe
ELECTRICIAN
$32.31 + $13.66 fringe
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY)
$30.74 + $16.51 fringe
Published May 18, 2026
North Carolina • Alexander, Burke, Caldwell
PIPEFITTER
$33.96 + $13.48 fringe
PLUMBER
$33.96 + $13.48 fringe
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY)
$30.74 + $16.51 fringe
Published May 18, 2026
North Carolina • Forsyth
ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING AND ALARM INSTALLATION
$20.08 + $0.00 fringe
PLUMBER
$19.73 + $0.00 fringe
BRICKLAYER
$18.62 + $0.00 fringe
Not affiliated with the U.S. Government. Verify final wage determination applicability and full text on SAM.gov.