Skip to content
SAM WDOL Directory

Wage Determinations

Review SCA, DBA, and CBA wage determinations with location coverage, revisions, rates, and benefit references.

473 records • Page 3 of 20
DBA
309
SCA
91
CBA
73
Active
473
With Rates
399
With Benefits
91
How To Choose
DBA (Construction)
Use for construction, alteration, or repair labor tied to Davis-Bacon prevailing wage requirements.
SCA (Service Contracts)
Use for service contracts where labor categories map to service occupation codes and fringe benefit rules.
CBA (Union Terms)
Use when the solicitation references collective bargaining agreement terms for covered labor classes.
Published May 18, 2026
Michigan • Jackson
ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING)
$56.05 + $30.52 fringe
PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY
$47.28 + $25.25 fringe
PLUMBER (INCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION)
$46.29 + $25.43 fringe
Published May 18, 2026
Michigan • Kalkaska
PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY
$47.28 + $25.25 fringe
PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY
$43.93 + $25.25 fringe
BOILERMAKER
$43.50 + $37.64 fringe
Published May 18, 2026
Michigan • Leelanau
PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY
$47.28 + $25.25 fringe
PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY
$43.93 + $25.25 fringe
BOILERMAKER
$43.50 + $37.64 fringe
Published May 18, 2026
Michigan • Grand Traverse
PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY
$47.28 + $25.25 fringe
PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY
$43.93 + $25.25 fringe
BOILERMAKER
$43.50 + $37.64 fringe
Published May 18, 2026
Michigan • Calhoun
PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY
$48.98 + $25.25 fringe
PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY
$45.68 + $25.25 fringe
PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY
$44.00 + $25.25 fringe
Published May 18, 2026
Michigan • Iron, Keweenaw
PIPEFITTER (EXCLUDES HVAC PIPE & SYSTEM INSTALLATION)
$45.44 + $28.43 fringe
ASBESTOS WORKER/HEAT & FROST INSULATOR
$45.24 + $30.56 fringe
PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE
$44.92 + $25.00 fringe
Published May 18, 2026
Michigan • Mason
PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY
$47.28 + $25.25 fringe
PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY
$43.93 + $25.25 fringe
BOILERMAKER
$43.50 + $37.64 fringe
Published May 18, 2026
Michigan • Tuscola
PIPEFITTER (HVAC PIPE INSTALLATION ONLY)
$45.50 + $21.75 fringe
PIPEFITTER (EXCLUDES HVAC PIPE AND SYSTEM INSTALLATION)
$45.50 + $21.75 fringe
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2 (AREA 2: LEVEL B AND C)
$44.13 + $24.85 fringe
Published May 18, 2026
Michigan • Ingham
PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY
$48.98 + $25.25 fringe
PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY
$45.68 + $25.25 fringe
PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY
$44.00 + $25.25 fringe
Published May 18, 2026
Michigan • Manistee
PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY
$47.28 + $25.25 fringe
PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY
$43.93 + $25.25 fringe
BOILERMAKER
$43.50 + $37.64 fringe
Published May 18, 2026
Michigan • Schoolcraft
PIPEFITTER (EXCLUDES HVAC PIPE & SYSTEM INSTALLATION)
$45.44 + $28.43 fringe
ASBESTOS WORKER/HEAT & FROST INSULATOR
$45.24 + $30.56 fringe
PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE
$44.92 + $25.00 fringe
Published May 18, 2026
Michigan • Sanilac
ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING)
$51.32 + $28.44 fringe
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2 (AREA 2: LEVEL B AND C)
$44.13 + $24.85 fringe
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1 (AREA 1: LEVEL B AND C)
$44.13 + $24.85 fringe
Published May 18, 2026
Michigan • Barry, Ionia, Kent +1
Fringes OPERATOR: POWER EQUIPMENT: BACKHOE/EXCAVATOR; BULLDOZER; GRADER/BLADE; LOADER; SCRAPER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY
$41.28 + $25.25 fringe
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION (BARRY (TOWNSHIPS OF CARLTON, IRVING, THORNAPPLE & WOODLAND), IONIA (EXCEPT TOWNSHIPS OF DANBY & PORTLAND), KENT & NEWAYGO COUNTIES)
$39.89 + $23.82 fringe
PLUMBER: EXCLUDING HVAC PIPE INSTALLATION (BARRY (TOWNSHIPS OF CARLTON, IRVING, THORNAPPLE & WOODLAND), IONIA (EXCEPT TOWNSHIPS OF DANBY & PORTLAND), KENT & NEWAYGO COUNTIES)
$37.09 + $22.52 fringe
Published May 18, 2026
Michigan • Emmet
PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY
$47.28 + $25.25 fringe
PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY
$43.93 + $25.25 fringe
BOILERMAKER
$43.50 + $37.64 fringe
Published May 18, 2026
Michigan • Muskegon
PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION
$47.40 + $23.35 fringe
PIPEFITTER (INCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION)
$47.40 + $23.35 fringe
BOILERMAKER
$43.50 + $36.74 fringe
Published May 18, 2026
Michigan • Montmorency
PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY
$44.13 + $25.25 fringe
PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY
$43.93 + $25.25 fringe
BOILERMAKER
$43.50 + $37.64 fringe
Published May 18, 2026
Michigan • Wayne
BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS OF SERVICE AS VACATION PAY CREDIT
$65.01 + $38.44 fringe
SPRINKLER FITTER (FIRE SPRINKLERS)
$53.57 + $33.95 fringe
ELECTRICIAN
$51.32 + $28.54 fringe
Published May 18, 2026
Michigan • Benzie, Kalkaska
PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY
$48.98 + $25.25 fringe
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BORING MACHINE, CRANE, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY)
$45.98 + $25.25 fringe
PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY
$45.68 + $25.25 fringe
Published May 18, 2026
Michigan • Arenac
PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY
$47.28 + $25.25 fringe
PIPEFITTER (HVAC PIPE INSTALLATION ONLY)
$45.50 + $21.75 fringe
PIPEFITTER (EXCLUDES HVAC PIPE AND SYSTEM INSTALLATION)
$45.50 + $21.75 fringe
Published May 18, 2026
Michigan • Grand Traverse
PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY
$48.98 + $25.25 fringe
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, CRANE, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY)
$45.98 + $25.25 fringe
PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY
$45.68 + $25.25 fringe
Published May 18, 2026
Michigan • Montcalm
PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY
$47.28 + $25.25 fringe
PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY
$43.93 + $25.25 fringe
BOILERMAKER
$43.50 + $37.64 fringe
Published May 18, 2026
Michigan • Alcona, Alger, Allegan +80
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL A)
$34.98 + $19.70 fringe
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL A)
$34.68 + $19.70 fringe
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL B AND C)
$34.03 + $19.70 fringe
Published May 18, 2026
Michigan • Branch
PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY
$47.28 + $25.25 fringe
PIPEFITTER (HVAC PIPE INSTALLATION ONLY)
$46.29 + $25.43 fringe
PIPEFITTER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION)
$46.29 + $25.43 fringe
Published May 18, 2026
Michigan • Alpena
PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY
$44.13 + $25.25 fringe
PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY
$43.93 + $25.25 fringe
BOILERMAKER
$43.50 + $37.64 fringe
Not affiliated with the U.S. Government. Verify final wage determination applicability and full text on SAM.gov.